JOINT OPTIMIZATION INVENTORY MODEL WITH STOCHASTIC DEMAND AND CONTROLLABLE LEAD TIME BY REDUCING ORDERING COST AND SETUP COST

TitleJOINT OPTIMIZATION INVENTORY MODEL WITH STOCHASTIC DEMAND AND CONTROLLABLE LEAD TIME BY REDUCING ORDERING COST AND SETUP COST
Publication TypeJournal Article
Year of Publication2017
AuthorsVIJAYASHREE, M, UTHAYAKUMAR, R
Secondary TitleCommunications in Applied Analysis
Volume21
Issue2
Start Page151
Pagination36
Date Published02/2017
Type of Workscientific: mathematics
ISBN Number1083-2564
AMS90B05, 90C25, 90C30
Abstract

This paper explores the setup and order processing cost reduction in the single vendor and the single buyer integrated production inventory model. The mathematical model is derived to investigate the effects of the optimal decisions when capital investment strategies in setup and order processing cost reduction are adopted. This proposed model intends to derive the exact cost function for the entire supply chain including logarithmic investment functions and an efficient computational algorithm is constructed to find the best solution.
We have developed the set up cost and ordering cost reductions in an integrated inventory production system in which demand during the lead time follows a normal distribution. The objective of this paper is to minimize the integrated total cost by optimizing the order quantity, setup cost, ordering cost, safety factor and number of deliveries simultaneously. An algorithm to find the optimal solutions is developed.
Order cost and setup cost are considered as logarithmic functions of capital investment. Besides, an efficient algorithm is developed to determine the optimal solution, and our approach is illustrated through a numerical example. A computer code using the software Matlab is developed to derive the optimal solution and numerical example is presented to illustrate the model. Finally, sensitivity analysis is carried out with respect to the key parameters and some managerial implications are also included.
 

URLhttp://www.acadsol.eu/en/articles/21/2/1.pdf
DOI10.12732/caa.v21i2.2
Short TitleJoint Optimization Model
Alternate JournalCAA
Refereed DesignationRefereed
Full Text

REFERENCES

[1] A. Banerjee, A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17  (1986), 292-311.

[2] Ben-M. Daya and A. Raouf, Inventory models involving lead time as a decision variable. Journal of the Operational Research Society 45  (1994), 579-582.

[3] H.C. L. ChangY. K. OuyangS. Wu and C.H. Ho, Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research 170  (2006), 481-495.

[4] C.H. Glock, Lead time reduction strategies in a single vendor-single buyer integrated inventory model with lot size-dependent lead time and stochastic demand. International Journal of Production Economics, 136  (2012), 37-44.

[5] C.H. Glock, The joint economic lot size problem: A review. International Journal of Production Economics, 135  (2012), 671-686.

[6] S.K. Goyal, An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15  (1976), 107-111.

[7] S.K. Goyal, A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19  (1988), 236-241.

[8] S.K. Goyal, A one vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research 82  (1995), 209-210.

[9] S.K. Goyal and F. Nebebe, Determination of economic production-shipment policy for a single-vendor-single-buyer system. European Journal of Operational Research 121  (2000), 175-178.

[10] D. Ha and S.L. Kim, Implementation of JIT purchasing: An integrated approach. Production Planning {\&] Control 8  (1997), 152-157.

[11] G. Hadley and T. Whitin,. Analysis of Inventory Systems. Prentice-Hall, New Jersey, 1963.

[12] R.W. Hall, Zero Inventories. Dow Jones-Irwin, Homewood, Illinois, 1983.

[13] M. Hariga and Ben-M. Daya, Some stochastic inventory models with deterministic variable lead time. European Journal of Operational Research 113  (1999), 42-51.

[14] R.M. Hill, The single-vendor single-buyer integrated production-inventory model with a generalized policy. European Journal of Operational Research 97  (1997), 493-499.

[15] R.M. Hill, The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem. International Journal of Production Research 37  (1999), 2463-2475.

[16] M.A. Hoque, A vendor-buyer integrated production inventory model with normal distribution of lead time. International Journal of Production Economics 144  (2013), 409-417.

[17] K.L. Hou, An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modelling 31  (2007), 10-17.

[18] B.A. Jalbar, J. Gutierrez and J. Sicilia, Integer-ratio policies for distribution/inventory systems. International Journal of Production Economics 93-94  (2005), 407-415.

[19] P. Kelle, Al-khateeb, F. and P.A. Miller, Partnership and negotiation support by joint optimal ordering/setup policies for JIT. International Journal of Production Economics 81-82  (2003), 431-441.

[20] G. Keller and H. Noori, Justifying new technology acquisition through its impact on the cost of running an inventory policy. IIE Transactions 20  (1988), 284-291.

[21] K.L. Kim, J.C. Hayya and J.D. Hong, Setup reduction in economic production quantity model. Decision Sciences 23  (1992), 500-508.

[22] C.J. Liao and C.H. Shyu, An analytical determination of lead time with normal demand. International Journal of Operations and Production Management 11  (1991), 72-78.

[23] L. Lu, A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research 81  (1995), 312-323.

[24] I. Moon and S. Choi, A note on lead time and distributional assumptions in continuous review inventory models. Computers and Operations Research 25  (1998), 1007-1012.

[25] F. Nasri, J.F. Affisco and M.J. Paknejad, Setup cost reduction in an inventory model with finite-range stochastic lead times. International Journal of Production Research 28  (1990), 199-212.

[26] L.Y. Ouyang and H.C. Chang, Lot size reorder point inventory model with controllable lead time and set-up cost. International Journal of Systems Science 33  (2002), 635-642.

[27] L.Y. Ouyang, C.K. Chen and H.C. Chang, Lead time and ordering cost reductions in continuous review inventory systems with partial backorders. Journal of the Operational Research Society 50  (1999), 1272-1279.

[28] L.Y. Ouyang, K.S. Wu and C.H. Ho, Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics, 92  (2004), 255-266.

[29] L.Y. Ouyang, N.C. Yeh and K.S. Wu, Mixture inventory model with backorders and lost sales for variable lead time. Journal of the Operational Research Society 47  (1996), 829-832.

[30] M.J. Paknejad, F. Nasri and J.F. Affisco, Defective units in a continuous review (s, Q) system. International Journal of Production Research 33  (1995), 2767-2777.

[31] J.C. PanH. and J.S. Yang, A study of an integrated inventory with controllable lead time. International Journal of Production Research, 40  (2002), 1263-1273.

[32] E.L. Porteus, Investing in reduced setups in the EOQ model. Management Science 31  (1985), 998-1010.

[33] R.J. Tersine, Principles of Inventory and Materials Management. Prentice Hall, Englewood Cliffs, New Jersey, 1994.

[34] S. Viswanathan, Optimal strategy for the integrated vendor-buyer inventory model. European Journal of Operational Research, 105  (1998), 38-42.

[35] M.Y. Wu and H.M. Wee, Buyer-seller joint cost for deteriorating items with multiple- lot-size deliveries. Journal of the Chinese Institute of Industrial Engineering 18  (2001), 109-119.

[36] P.C. Yang and H.M. Wee, Economic order policy of deteriorated item for vendor and buyer: An integrated approach. Production Planning and Control 11  (2000), 474-480.

[37] P.C. Yang and H.M. Wee, An arborescent inventory model in a supply chain system. Production Planning {\&] Control, 12  (2001), 728-735.

[38] P.C. Yang and H.M. Wee, A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. European Journal of Operational Research 14  (2002), 570-581.

[39] P.C. Yang and H.M. Wee, An integrated multi-lot-size production inventory model for deteriorating item. Computers {\&]Operations Research 30  (2003), 671-682.

[40] Y.G. Yu, L. Liang, C. Wang and Z.Q. Wang, An integrated vendor-managed-inventory model for deteriorating item. Chinese Journal of Management Science 12  (2004), 32-37.

[41] T. Zhang, L. Liang, Y. Yu and Yan, Yu, An integrated vendor-managed inventory model for a two-echelon system with order cost reduction. International Journal of Production Economics, 109 . (2007), 241-253.